Type: Architectural drawing
File Size: 772 KB
Summary

This document is a first-floor architectural plan for the 'Epstein Residence' at 358 El Brillo Way, Palm Beach, Florida, dated September 24, 1994. Created by architects Roger Wm. Sahli and Michael J. Johnson, the drawing includes extensive handwritten notes detailing proposed renovations, such as modifying the pool, updating rooms, and ensuring compliance with FEMA regulations for certain equipment.

People (3)

Name Role Context
Epstein Client/Resident
The drawing is titled 'EPSTEIN RESIDENCE', indicating the project is for their property.
ROGER WM. SAHLI Architect
Listed as the primary architect for the Epstein Residence project.
MICHAEL J. JOHNSON Associated Architect
Listed as the associated architect for the Epstein Residence project.

Organizations (3)

Name Type Context
ROGER WM. SAHLI ARCHITECT Company
The architectural firm listed on the drawing for the Epstein Residence.
MICHAEL J. JOHNSON ASSOCIATED ARCHITECT Company
The associated architectural firm listed on the drawing for the Epstein Residence.
FEMA Government Agency
Mentioned in handwritten notes regarding regulations for elevating equipment: 'PAD ELEV 7.5' PER FEMA REGULATIONS', '...

Timeline (1 events)

1994-09-24
Creation of a first-floor plan and partial site plan for the Epstein Residence, including numerous handwritten notes detailing proposed renovations to the interior, exterior, and pool area.
Epstein Residence, 358 El Brillo Way, Palm Beach, Florida

Locations (7)

Location Context
The title of the project.
The address of the Epstein Residence.
The address of Roger Wm. Sahli, Architect.
The address of Michael J. Johnson, Associated Architect.
Location of the Epstein Residence.
Location of Roger Wm. Sahli's architectural firm.
Location of Michael J. Johnson's architectural firm.

Relationships (3)

Epstein Professional ROGER WM. SAHLI
Roger Wm. Sahli is listed as the architect for the 'EPSTEIN RESIDENCE' on the architectural drawing.
Epstein Professional MICHAEL J. JOHNSON
Michael J. Johnson is listed as the associated architect for the 'EPSTEIN RESIDENCE' on the architectural drawing.
ROGER WM. SAHLI Professional MICHAEL J. JOHNSON
Both are listed as Architect and Associated Architect, respectively, on the same project drawing for the Epstein Residence.

Full Extracted Text

Complete text extracted from the document (2,579 characters)

GOVERNMENT EXHIBIT 298
S2 20 Cr. 330 (AJN)
EPSTEIN RESIDENCE
358 El Brillo Way
Palm Beach, Florida
ROGER WM. SAHLI
ARCHITECT
25 EAST 78 STREET
NEW YORK, NEW YORK 10021
TEL: 212 439 9094
FAX: 212 439 9106
MICHAEL J. JOHNSON
ASSOCIATED ARCHITECT
1137 CLARE AVENUE
WEST PALM BEACH, FLA.
407 832 0500
REVISIONS
NO. DESCRIPTION DATE
DRAWING TITLE
FIRST FLOOR PLAN
PARTIAL SITE PLAN
SCALE 1/4" = 1'-0"
DATE 9-24-94
PROJECT NO.
DRAWING NO. A-1
DRIVEWAY
GARAGE
MECH. RM.
LAUNDRY
BACK HALL
STAFF
KITCHEN
PANTRY
FOYER
DINING ROOM
LAKE ROOM
GARDEN ROOM
SWIMMING POOL
PLANTER
Handwritten Notes:
REMOVE EXIST. THRU-WALL A/C UNIT & INSTALL NEW REAR PORCH KITCHEN
NEW SLAB & EXIST CONDENSING UNIT TO NEW PAD AT REAR PORCH, PAD ELEV 7.5' PER FEMA REGULATIONS
NEW PRECAST CONCRETE PAD (4'x5') TO BE CONNECTED TO SLAB DEVELOPED BY NORTH/SOUTH (?) OF PORCH
INSTALL NEW MOTORIZED SLIDING GATE AT DRIVEWAY
EXIST. 5' HIGH COD WALL
REMOVE EXIST A.C. UNIT & INSTALL NEW A.C. UNIT @ ELEV 7.5' TO COMPLY W/ FEMA
RAISE EXIST. WATER HEATER & STORAGE TANK TO ELEV. 7.5' PER FEMA
REMOVE EXIST. SERVICE SINK & CAP LINES (PER FEMA)
INSTALL NEW SOLID W/ GLASS PANEL
EXIST. MOTORIZED GARAGE DOOR TO REMAIN
INSTALL NEW PLANTATION SHUTTER
INSTALL NEW UNO-TILE FLOOR ATOP EXIST. STONE TILE THRU KITCHEN & PANTRY
INSTALL NEW BEVELED GLASS PANEL IN PLACE OF BEVELED GL. PANEL
INSTALL NEW FRAME & SHUTTER @ PATCH PLASTER
INSTALL NEW PATCH CEILING
PATCH CEILING AS REQ'D BY PLUMBING WORK ABOVE. PAINT
INSTALL NEW HEIGHT CABINET TO CEILING W/ STATUE & LIGHTING TO GARDEN ROOM
INSTALL STL. PIPE FRAME CENTERED ON DOORS
INSTALL NEW PLANTATION SHUTTERS CENTERED ON GLASS DOORS
PATCH CEILING AS REQ'D BY PLUMBING WORK ABOVE - PAINT
INSTALL NEW PLANKED FLOOR W/ MARBLE SHELVES FLOOR TO CEILING
INSTALL NEW PECKY CYPRESS BOARDING
INSTALL NEW RETRACTABLE AWNING - MOTORIZED
NEW CONC. TERRACE W/ PRE-CAST PAVERS (#3) 2'x2' SQ. MIN.
MODIFY EXIST. CROWN MOULDING AS REQ'D TO ACCOMODATE SHUTTERS
INSTALL NEW FLAT CYPRESS BOARDING ON WALLS, VERTICAL (?)
Pool Notes:
CONSTRUCT NEW POOL WALL TO SQUARE OFF POOL. ABANDON OLD STEPS, FILL AND COVER OVER WITH CONCRETE & TRAVERTINE PAVING TO MATCH. CONSTRUCT NEW STEPS.
REMOVE EXIST'G. TILE & WATERLINE. INSTALL NEW TILE. REPAIR LEAK & RESURFACE ENTIRE INTERIOR OF POOL.
REMOVE EXIST. JACUZZI, FILTER, PUMPS, FILTERS, HEATERS ETC. REMOVE ADJ. TRAVERTINE PVMT. SLOPE OF SOIL/VALVE TO BE DETERMINED IN FIELD BY ARCHITECT. INSTALL NEW TRAP, PIPING TO MATCH.
INSTALL NEW (OR FABRICATED) METAL SPIRAL STAIR.
INSTALL NEW AWNING MOTORIZED
NEW COLE SPIRAL STAIR